2024-11-13 State Grid Turfan Power Supply Company HaiPress
TURFAN,China,Nov. 13,2024 -- On November 13,Turfan's annual "coal-to-electricity" project was completed,and 90,172 households bid farewell to traditional coal-fired heating and achieved clean heating.
In order to allow residents to use cleaner and safer new electric heating equipment as soon as possible,the State Grid Turfan Power Supply Company completed the combing of power grid engineering projects in advance,organized key forces to speed up the transformation of supporting rural power grid projects,completed the assembly of 12,983 poles,tightened 511.49 kilometers of lines,and installed 384 distribution transformers.
Compared with traditional coal-fired heating,electric heating does not have any gas and smoke emissions,the thermal efficiency reaches 95%,and the controllability is strong,which can realize the control of households and rooms,so that people can stop heating,and effectively improve the heating efficiency and experience of the majority of residents.
After three years of construction,248,400 households have been renovated from coal to electricity,covering Hami,Turfan,Bazhou,Aksu,Kashgar,Hotan and other regions.
China, EU respondents optimistic about prospects of future cooperation: GT survey
Sambaex Unveils Strategic Roadmap, Targeting Growth by 2027 and 2028 with Strong Commitment to Social Responsibility
Donald Trump shares AI image of 'his tender embrace with Jesus' in front of American flag
How a volcano triggered a global catastrophe and a 'year without summer'
Meghan Markle ditches royal title and suggests more 'relaxed' name during Australia visit
Boy, 14, kills nine people in Turkey's second school shooting in two days
©copyright 2009-2020 Diet Tips Daily